M. F Chapter 262: Interested Giants Heavy Industry


The underground passage, which can accommodate two trucks in parallel, was almost squeezed out of the trampling accident by the developers who had big waists and rounds.

Above the corridor, it was parked just like a car show.
Audi, Bentley, Mercedes-Benz, BMW Seven Series, Jaguar, Range Rover...
Not only in the urban area of Zhongyun but even the real-estate tycoons in several counties far away Zhongyun have also come.
This year, real estate is difficult to do competition is increasing, and costs are getting higher and higher.
Free two huge taxes!
This temptation is like playing the legend in the past, GM patted you on the shoulder and said:
"Brother, as long as you take Shabak, we will reward you with a dragon slaughter."
This will cause the sky to turn upside down.
For example, in the passageway now there is a well-dressed boss with two littles honey girls, wandering in the mood visit the historical building, wandering in the passageway.
Directly behind the same boss, a rich boss grabbed the two little honey arms, as if he were a dog that fell on shit to eat.
"Sorry …"
The boss dropped a sentence of apology and ran away in a hurry.
The structure is hung on the passage.
After the bosses rushed down with their mobile phones or tablets, they drilled into the steel gate.
When they returned to the nest, they disappeared inside the passageway, and Ye Qing came in.
As an ambitious man, Ye Qing also could not refuse to build a state-of-the-art industrial building in his own city center.
Bones are hard to chew.
However, the three preferential projects of the Urban Construction Bureau turned out to be born, and Ye Qing calculated the accounts in his heart.
If he builds his own ten-story building, he can save 100 million Yuan.
The 30-story building can save 500 million Yuan.
If he builds a forty-story building, he can save nine hundred million.
Building one hundred floors can save two billion...
Two billion, how astronomical is this a number?
Usually, this number is only suitable for describing the number of sperm or the kind of elephants.
So Ye Qing is coming with data glasses, 3D cameras, and Master Craftsman.
Taking a picture of the structure on the channel, Ye Qing also drilled into the interior of the steel gate.
This underground building has three narrow arched refuge areas in addition to numerous reserves and a small outdoor office serving as a small service agency.
The refuge area is somewhat like a tunnel, especially long and narrow, without any support. Each refuge area can accommodate 2,500 citizens.
Now many project developers and bosses are in the refuge area on the orange lights, with the engineers brought frowning to discuss what.
When Ye Qing came here, these original and eager bosses had a very ugly shadow on their faces.
"I knew there was nothing good about the heavens."
With nine words A man with a mustache and a splayed character complained:
"Look at the structure here, there is no place to support the main beam of the building, even the next time you squat Can't find it."
"If you want to build a building without the main beam, isn't that a joke in your head?"
“Building? I don’t think it’s good to build a ten-story building.”
A boss with a cap and a cigar spoke:
"Look at where we are now. There are no pillars in this narrow arch refuge area, which means that when we build a building, there will be no load-bearing structure above it."
"There are buildings built in accordance with the underground structure. What is the difference between the repaired building and the original department store?"
“The difference between the five and ten floors is there is no underground parking lot.”
"Underground parking lots can't be repaired. They can be repaired on the ground."
The young man on Ye Qing's left hand joked:
"The parking lot on the ground is fresh, and a layer of gold shops are completely cut, leaving customers to park."
“Or you can cut all the load-bearing walls and re-plan the load-bearing area.”
"General Liu, shall we withdraw and let you come?"
"As long as you can cut and replace the load-bearing walls, you can plan as you want for a ten-story building."
"The concrete under the foot is also completely cut."
The cap is in an obviously harmful position to the person:
"If you cut all the concrete below, you can pile the building below to ensure you can make a big profit."
"Ha … ha … good idea, I will ask if the umbrella companies if they want to work with us. They are best at underground civil construction."
The relatively young man said, waving his hand to the engineer to leave with him.
"I flash, too."
The man in the cap followed:
"Everyone has to look at this piece of land and quickly start, our Hailong company is still honestly going back to build a community."
Several of the most powerful predators left, and the rest of the bosses, who were not too big, got up one by one and returned to the surface according to the path on the structure map.
They don't know how to be good, GM, they really want to send a dragon knife, but need a 60-level wizard to equip.
More than half of the people went and there were still some leaders who held the electronic version of the fascinating research of the structure of the site.
They are not only looking at the electronic drawings but also accompanying the staff, holding the drawing board and writing and drawing on them with pencils.
Ye Qing is also studying, just to be more casual, the Master Craftsman with a sci-fi instrument in his hand aiming at the surrounding walls and making a crisp sound of.
"Clicks … clicks …".
I took a look at the drawing board and found they were doing the load-bearing structure of the civil air defense project.
Bite the pencil, scratch your head, rub your thighs and lick your lips.
Occasionally, the surprise expression was smashed, and then the expression turned into doubt, then confused, and then disappointed.
These people have played a more focused role than the college entrance examination in the face of huge interests.
"Clicks … clicks …"
The crisp knocking sound continued, and the structural engineer who tormented the straw paper into pieces was standing up and shouted with anger:
"There is no end, not a hardness tester. What equipment is there?"
"Good boy!"
The Master Craftsman looked at the instrument in his hand and the instrument in the engineer's hand.
He looked at the engineer again and said:
"If I have a hardness tester, then what you have in your hand is a compass for pupils."
"For a long time, nothing has been figured out!"
"You..."
The engineer rose red.
"Okay!"
Ye Qing waved his hand and motioned that he would stop hitting again:
"Let's go up too."
On the ground, Ye Qing found the bosses had not left but surrounded by a pile of complaints.
There is still one person standing in the circle.
Ye Qing thought that he was the owner of Xinghe Construction.
“Secretary.”
Someone in the crowd complained:
"At most, we can only build ten-story buildings on them. What's the use of taking over the development?"
“Secretary, do you want to give more discounts? For example, exempt business tax, urban construction maintenance tax, land value-added tax?”
"Ladies and gentlemen."
Le Zhengdong signaled everyone to be quiet:
"Our URA has given the biggest preferential project. I believe you can design the most reasonable building according to the structural plan."
"Wisdom is endless, and civil defense work is not easy to change. We can use our brains in the superstructure."
This group of bosses, it is very vague to show you continue to pull expressions.
Le personally came over, there is no way, in the national health and civilized 's selection section, you can't always let the prime location of the be as old as the unfinished building.
He wanted to continue to persuade and advise several bosses inside to win the land.
For example, after taking the land, you can give certain discounts on other projects that they develop later.
Then Le Zhengdong saw Ye Qing.
Ye Qing’s Monster Heavy Industry has a big name, and now there is no one in Zhongyun City do not know it.
At this time Ye Qing was on the phone, and Le Zhengdong planned to wait for him to finish the call and greet him after that.
Waiting Ye Qing, the director Le Zhengdong feels something is wrong.
What...?
He faintly heard, Ye Qing said on the phone, who is going to register a construction company?
What does he do with his registered construction company?
The Hongtou Zhongyun Heavy Industries, this quarter to pay the amount of corporate tax, almost took out the eyes of the two mayors.
If there are ten high-tech industrial companies like Big Beast Heavy Industries in Zhongyun, their waistlines can stand up to the sky.
It's not necessary for a construction company like Big Beast Heavy Industries to get involved in real estate.
Real estate?
Standing on this piece of land to be developed, Le Zhengdong, suddenly made a splash.
I don't know why the little old man next to Ye Qing let Le Zhengdong have a very anxious feeling.
The little old man looked at the underground passage from time to time.
He looks at the passage, and hides the expression of the civil defense project at the foot like the Olympic champion, watching a 1 + 1 math problem.
In his eyes, it is no longer the confidence of winning the game, and it is completely ignored.
Will it...
Le Zhengdong feels that the preferential projects taken by the Urban Construction Bureau are not perfect enough?
For example, if you exceed a certain number of floors, you will not be exempt from deed tax and property tax.
There should be no such thing as he worried, and Le Zhengdong’s mind turned around and felt that he might be a bit worried.
--------------------------------------------------


Ps: if you liked this series and want to finish it as soon as possible, your support encourages me to broadcast more chapters per month


https://www.patreon.com/RASensei

Comments

  1. "Big Beast Heavy Industry" seriously WTF at mis translating the company name again.

    ReplyDelete

Post a Comment

https://www.patreon.com/RASensei

Popular posts from this blog

G of L Chapter 1: When People Are Poor

D F T F Chapter 1: A future police.

G of L Chapter 2: 30,000 yuan